Before, During, and After 
Escape window wells are added.  This IS a deep basement!
Escape window wells are added. This IS a deep basement!
Viewed: 1475 times.

Once the forms all come off, the basement really takes shape.
Once the forms all come off, the basement really takes shape.
Viewed: 1526 times.

After the drains, escape wells are installed and the basement "damp proofed", the walls are back filled from the "trailings" dug out of the hole.
After the drains, escape wells are installed and the basement "damp proofed", the walls are back filled from the "trailings" dug out of the hole.
Viewed: 1660 times.

The framing begins with studs along the dead wall and a plate on the foundation perimiter.
The framing begins with studs along the dead wall and a plate on the foundation perimiter.
Viewed: 1472 times.

Soon after, the one load-bearing wall in the basement gets framed in.
Soon after, the one load-bearing wall in the basement gets framed in.
Viewed: 1492 times.

Once the plate and load bearing structures are in place in the basement, the floor joists get installed: 14 inch tall laminate beams and 2x10s.
Once the plate and load bearing structures are in place in the basement, the floor joists get installed: 14 inch tall laminate beams and 2x10s.
Viewed: 1450 times.

Then 3/4" ply is glued and screwed in place for the floor decking.
Then 3/4" ply is glued and screwed in place for the floor decking.
Viewed: 2516 times.

Once the framing begins, things move quickly...at least for a while. This shows the scale of the addition to the 2.5 car garage.
Once the framing begins, things move quickly...at least for a while. This shows the scale of the addition to the 2.5 car garage.
Viewed: 1227 times.

Interior framing, with a view of the peak of the great room, which will have a vaulted ceiling.
Interior framing, with a view of the peak of the great room, which will have a vaulted ceiling.
Viewed: 1338 times.